Project Case Study

Glazed Living-Space Installation

A glazed living-space module under installation, showing dark aluminium-framed floor-to-ceiling glazing.

Country
Vietnam
Application
Residential, Construction
Documentation
Project photographs and videos

Project Overview

This construction record from Vietnam shows a modular living space during the glazing installation stage. Dark aluminium frames support floor-to-ceiling glass panels, and the photograph documents the glazing work in progress. The installation video shows the glazing being fitted.

The record focuses on the glazing installation stage rather than a completed building. The dark aluminium frames and the floor-to-ceiling glass panels are visible in the photograph, and the brick base structure is partially visible below the glazing.

Project Highlights

  • Floor-to-Ceiling Dark Aluminium Glazing

    The living space uses dark aluminium frames with floor-to-ceiling glass panels. The glazing arrangement is visible in the photograph and the installation video.

  • Glazing Installation Documented

    The installation video documents the glazing being fitted to the aluminium frames. This provides a reference for the installation sequence used in this type of glazed living space.

  • Brick Base Structure Visible

    The brick base structure is partially visible below the glazing in the photograph. This shows the interface between the modular glazing system and the base structure.

Project Videos

1 video

Glazed Living-Space Installation — Glazing Work in Progress

Planning a Modular Living Space with Floor-to-Ceiling Glazing?

These are useful discussion points when planning a modular living space with floor-to-ceiling glazing. They are starting points for a conversation, not a fixed specification.

Glazing Frame Colour and Glass Specification

The frame colour and glass specification — including solar control and privacy options — are agreed at the design stage.

Base Structure and Foundation Interface

The interface between the glazing system and the base structure needs to be coordinated at the design stage. The base structure type and the connection details are confirmed based on the site conditions.

Thermal and Weather Performance

Floor-to-ceiling glazing has implications for the thermal performance of the space. The glazing specification and any shading provisions are discussed at the design stage based on the local climate.

Frequently Asked Questions

Interested in a similar project?

Contact our team to discuss your requirements. We supply modular structures for a wide range of applications worldwide.