Category 02
Modular Bathroom Pods
Self-contained bathroom units manufactured and finished in the factory — arrive on site ready to connect to building services.
Product Gallery
Use Cases
Application Scenarios
Hotel Room Integration
Bathroom pods are integrated into modular hotel room units in the factory, arriving on site as a complete room module with bathroom already installed. This eliminates wet trades on site and ensures consistent finish quality across all rooms.
Conventional Hotel Construction
Pods are craned into position within a conventional concrete or steel frame building before the floors above are cast or installed. This approach is widely used in hotel construction to accelerate the fit-out programme.
Student Accommodation
Compact bathroom pods for student accommodation projects where a high volume of identical units is required. Factory production delivers consistent quality and reduces on-site programme time.
Healthcare Facilities
Bathroom pods for healthcare and care-home projects where infection control, accessibility, and durability are priorities. Finishes and fixture selection are specified to the project's clinical brief.
Why Choose This Product
Why Specify Modular Bathroom Pods
Eliminates Wet Trades On Site
Tiling, plumbing, and electrical work are completed in the factory. This removes wet trades from the critical path on site and reduces the risk of programme delays.
Consistent Finish Quality
Factory production with fixed jigs and quality checks delivers consistent dimensional accuracy and finish quality across every pod — important for large hotel and student accommodation projects.
Faster On-Site Installation
Pods are craned into position and connected to building services in a fraction of the time required for conventional bathroom construction.
Reduced Snagging
Factory-finished pods arrive with fewer defects than conventionally built bathrooms, reducing the volume of snagging work at practical completion.
Flexible Fixture Selection
Fixture brand, style, and finish are selected to the buyer's specification. Both wet-room and enclosed shower configurations are available.
Export-Ready Packing
Pods are packed for sea freight and can be shipped to any port worldwide. Connection details and installation instructions are supplied with each shipment.
Configuration
Pod Configuration Options
Wet Room Configuration
Open wet-room layout with floor drain, wall-mounted fixtures, and waterproof wall and floor finishes. Suitable for accessible bathrooms and contemporary hotel designs.
Enclosed Shower Configuration
Enclosed shower cubicle with separate WC and vanity area. Suitable for standard hotel rooms and student accommodation where space efficiency is important.
Accessible Configuration
Accessible bathroom layout with turning space, grab rails, and level-access shower. Dimensions and fixture positions are agreed with the buyer to meet the applicable accessibility standard.
Technical Data
Indicative Specifications
Dimensions and specifications are indicative only. All values are confirmed with the buyer before production.
Construction
Construction & Finish
Wall & Floor Finishes
Wall and floor finishes are selected to the buyer's specification. Tile, GRP panel, and solid surface options are available. This reference photograph shows a marble-effect tile finish with a frameless shower enclosure.
Vanity & Fixture Selection
Vanity unit, basin, WC, and shower fixture brand and style are selected to the buyer's specification. This reference photograph shows a wall-hung vanity with a large mirror and natural light from a window.
Integration with Room Module
Bathroom pods are integrated into room modules in the factory. The connection between the pod and the room module is detailed to ensure watertight and airtight performance.
Manufacturing
Factory Capability
Pengboxingchen operates a manufacturing facility in Wujiang District, Suzhou, Jiangsu, China. All products are fabricated in-house and packed for sea freight export. Quality checks are carried out at each production stage. Third-party inspection before dispatch can be arranged by the buyer.
All products are manufactured to agreed drawings and specifications. Quality checks are carried out at each production stage. Buyers may arrange third-party inspection before dispatch.
Logistics
Packing, Shipping & Installation
Bathroom pods are packed for sea freight export in standard 20ft or 40ft containers.
Packing lists, connection details, and installation instructions are supplied with each shipment.
Buyers are responsible for import clearance, local transport, and crane lifting into position.
Pods are connected to building services by the buyer's M&E contractor on site.
Buyers should confirm services connection requirements with their M&E consultant before ordering.
Third-party inspection before dispatch can be arranged by the buyer.
Common Questions
Frequently Asked Questions
Get in Touch
Request a Quote
Send us your project brief — floor area, quantity, site location, and timeline — and we will prepare a quotation. We supply buyers worldwide and can arrange sea freight to any port.
Contact Information
Group 5, Cao Village, Zhenze Town,
Wujiang District, Suzhou, Jiangsu, China
