Project Case Study

Living Unit with Circular Glazing

A white modular living unit with a distinctive large circular porthole window and sliding glass doors.

Country
Vietnam
Application
Residential
Documentation
Project photographs and videos

Project Overview

This modular living unit in Vietnam features a distinctive large circular porthole window on the upper section, sliding glass doors at ground level, and a balcony railing. The exterior walkthrough video documents the completed unit from the front.

The circular window is a prominent design feature that gives the unit a distinctive character. The sliding glass doors at ground level provide access to the interior and open the living space to the outside. The balcony railing is visible above the sliding doors.

Project Highlights

  • Large Circular Porthole Window

    The upper section of the unit features a large circular porthole window. This distinctive design element is visible in both the photograph and the walkthrough video.

  • Ground-Level Sliding Glass Doors

    Sliding glass doors at ground level provide access to the interior and open the living space to the outside. The doors are visible in the exterior photograph.

  • Balcony Railing Above the Sliding Doors

    A balcony railing is visible above the sliding doors. This provides a safety barrier for the upper section and adds to the visual character of the unit.

Project Videos

1 video

Living Unit with Circular Glazing — Exterior Walkthrough

Planning a Modular Living Unit with Custom Glazing?

These are useful discussion points when planning a modular living unit with custom glazing features. They are starting points for a conversation, not a fixed specification.

Custom Window Shape and Position

Custom window shapes — including circular or other non-standard forms — can be incorporated into the module design. The structural implications and the glazing specification are confirmed at the design stage.

Sliding Door Width and Opening Configuration

The width of the sliding door opening and the number of door panels affect both the appearance and the ventilation of the interior. These are agreed at the design stage.

Balcony and Upper-Level Treatment

The balcony railing design and the upper-level treatment are agreed at the design stage based on the intended use and the project aesthetic.

Frequently Asked Questions

Interested in a similar project?

Contact our team to discuss your requirements. We supply modular structures for a wide range of applications worldwide.