Project Case Study

Orange-Frame Modular Sample

A two-level modular sample building with an orange steel frame and grey panel cladding.

Country
Vietnam
Application
Sample
Documentation
Project photographs and videos

Project Overview

This two-level modular sample building in Vietnam features an orange steel frame with grey panel walls, white doors, and security windows. The exterior walkthrough video documents the completed sample from the front.

The orange frame is a prominent visual feature that contrasts with the grey panel walls. The two-level arrangement shows the stacking capability of the modular system, and the security windows and white doors are standard features of this type of unit.

Project Highlights

  • Orange Steel Frame with Grey Panel Walls

    The sample uses an orange steel frame with grey panel walls. The contrast between the frame colour and the panel colour is a distinctive feature of this configuration.

  • Two-Level Stacked Arrangement

    The sample shows two levels of modular units stacked vertically. This illustrates the stacking capability of the modular system.

  • Security Windows and White Doors

    The units feature security windows and white doors. These are standard features of this type of modular unit and are visible in both the photograph and the video.

Project Videos

1 video

Orange-Frame Modular Sample — Exterior Walkthrough

Planning a Two-Level Modular Building?

These are useful discussion points when planning a two-level modular building. They are starting points for a conversation, not a fixed specification.

Frame Colour and Panel Selection

The frame colour and panel colour are key design decisions. The options are discussed at the enquiry stage.

Stacking Method and Access Between Levels

The structural connection between the lower and upper modules and the staircase arrangement are confirmed at the design stage.

Security Features and Opening Configuration

The security window type, door specification, and lock arrangement are agreed at the enquiry stage based on the intended use.

Frequently Asked Questions

Interested in a similar project?

Contact our team to discuss your requirements. We supply modular structures for a wide range of applications worldwide.