Project Case Study

Glazed Commercial Space

A red-clad commercial building with a glazed frontage and tropical planting at the entrance.

Country
Vietnam
Application
Retail, Commercial
Documentation
Project photographs and videos

Project Overview

This commercial building in Vietnam features red corrugated cladding, a fully glazed frontage, and tropical plants framing the entrance. Two video clips document the interior fit-out work and the exterior of the completed space.

The red corrugated cladding gives the building a distinctive appearance, and the fully glazed frontage opens the interior to the street. The interior video shows fit-out work in progress, including painting and finishing. The exterior video documents the completed building from the front.

Project Highlights

  • Red Corrugated Cladding and Glazed Frontage

    The building uses red corrugated cladding on the side and rear elevations, with a fully glazed frontage. The contrast between the red cladding and the glazing is visible in the exterior photograph.

  • Tropical Planting at the Entrance

    Tropical plants frame the entrance to the building. The planting is visible in the exterior photograph and contributes to the commercial character of the space.

  • Interior Fit-Out Work Documented

    The interior video documents fit-out work in progress, including painting and finishing. This provides a reference for the construction sequence used in this type of commercial project.

Project Videos

2 videos

Glazed Commercial Space — Interior Fit-Out

Glazed Commercial Space — Exterior View

Planning a Modular Commercial Space with Glazed Frontage?

These are useful discussion points when planning a modular commercial space with a glazed frontage. They are starting points for a conversation, not a fixed specification.

Cladding Material and Colour

The cladding material and colour affect the appearance and the maintenance requirements of the building. Options are discussed at the enquiry stage.

Glazing Proportion and Frontage Design

The proportion of glazing on the frontage and the door arrangement affect both the appearance and the customer experience. These are agreed at the design stage.

Interior Fit-Out Scope

The interior fit-out scope — including flooring, wall finishes, and MEP — is agreed at the enquiry stage based on the intended use.

Frequently Asked Questions

Interested in a similar project?

Contact our team to discuss your requirements. We supply modular structures for a wide range of applications worldwide.