Category 14
Site Hoarding & Fencing
Temporary steel hoarding and fencing panels for construction site enclosure, perimeter security, and public safety separation — designed for repeated installation and removal.
Product Gallery
Use Cases
Application Scenarios
Construction Site Perimeter
Enclosure of construction site perimeters to contain dust and debris, prevent unauthorised access, and comply with site safety requirements. Panels are installed around the full site perimeter.
Road & Utility Works
Public safety separation at road works, utility trenching, and infrastructure maintenance. Panels create a clear separation between the work area and the public.
Demolition Site Hoarding
Robust hoarding for demolition sites where panels must withstand the conditions of a demolition operation. Panels are designed to be reused across multiple projects.
Temporary Security Fencing
Temporary security fencing for events, festivals, and sites requiring perimeter security. Panels can be configured to create a secure enclosure with controlled access points.
Why Choose This Product
Why Choose Our Site Hoarding & Fencing
Reusable Across Multiple Projects
Panels are designed for repeated installation and removal. The investment in panels is spread across multiple projects, reducing the cost per use.
Robust Steel Construction
Panels are constructed from steel to withstand the conditions of a construction or demolition site.
Quick Installation
The panel and post system is designed for quick installation by a small team. No specialist equipment is required for standard installations.
Configurable Layout
Panels can be arranged in any layout to suit the site. Corner, gate, and bracing components are available to complete the enclosure.
Flat-Pack Shipping
Panels are flat-packed for sea freight export, allowing a large number of panels to be shipped in a single container.
Export-Ready
Panels are packed for sea freight and can be shipped to any port worldwide.
Configuration
Panel & System Options
Standard Hoarding Panel
Standard steel hoarding panel with a painted or galvanised finish. Suitable for most construction site enclosure and public safety separation applications.
Post & Footing System
Steel post and footing system for free-standing panel installation. Post spacing and footing type are agreed with the buyer to suit the site conditions.
Gate Panel
Gate panels and gate hardware for controlled access points. Gate dimensions and hardware specification are agreed with the buyer.
Technical Data
Indicative Specifications
Panel dimensions and specifications are indicative only. All values are confirmed with the buyer before production.
Construction
Panel Construction
Steel Panel Construction
Panels are constructed from steel sheet with a profiled or flat face. Steel gauge, profile, and surface treatment are agreed with the buyer. Panels are designed for repeated installation and removal.
Post & Support System
Steel posts and footings support the panels in a free-standing configuration. Post spacing and footing type are agreed with the buyer to suit the site conditions and wind loading.
Flat-Pack Packing
Panels are flat-packed for sea freight export. A large number of panels can be loaded into a single container, reducing freight cost per panel.
Manufacturing
Factory Capability
Pengboxingchen operates a manufacturing facility in Wujiang District, Suzhou, Jiangsu, China. All products are fabricated in-house and packed for sea freight export. Quality checks are carried out at each production stage. Third-party inspection before dispatch can be arranged by the buyer.
All products are manufactured to agreed drawings and specifications. Quality checks are carried out at each production stage. Buyers may arrange third-party inspection before dispatch.
Logistics
Packing, Shipping & Installation
Panels are flat-packed for sea freight export in standard 20ft or 40ft containers.
A large number of panels can typically be loaded into a single container.
Packing lists and installation instructions are supplied with each shipment.
Buyers are responsible for import clearance, local transport, and installation.
Installation is carried out by the buyer's team using the supplied instructions.
Pengboxingchen can provide technical support by video call if required.
Common Questions
Frequently Asked Questions
Get in Touch
Request a Quote
Send us your project brief — floor area, quantity, site location, and timeline — and we will prepare a quotation. We supply buyers worldwide and can arrange sea freight to any port.
Contact Information
Group 5, Cao Village, Zhenze Town,
Wujiang District, Suzhou, Jiangsu, China
