Category 13

Prefabricated Buildings

Steel-framed, panel-clad buildings assembled on site for offices, workforce accommodation and support facilities. Layout, roof configuration and fit-out are agreed for each project.

Product Overview

Steel Frame

Steel columns, beams and roof trusses with protective finish per approved specification. Member sizes and surface treatment confirmed in the approved structural drawings.

Panel Enclosure

Colour-coated sandwich panels for walls and roof. Core material, thickness and exterior finish confirmed per project specification.

Project-Specific Layout

Floor plan, storey count, door and window positions, and internal partitions are agreed for each order. No fixed standard module applies.

Applications

Site Offices

Single-storey and multi-storey configurations are suitable for site management offices, meeting rooms and reception areas. The sheltered entrance configuration shown is typical of office use; the specific internal layout is agreed per project.

Workforce Accommodation

Multi-room layouts with external access stairs and covered walkways are commonly used for workforce dormitories and accommodation blocks. Storey count, room arrangement and shared facilities are confirmed per project requirements.

Site Support Facilities

Single-storey buildings with covered walkways are suited to canteens, welfare facilities, storage and other site support uses. The covered walkway configuration shown is a reference; the layout and enclosure are agreed per project.

Structure

Steel Frame & Bracing

The primary structure uses steel columns, beams and diagonal bracing with protective finish per approved specification. Roof trusses span the full building width and carry the roof load to the columns. Member sizes, connection details and surface treatment are specified in the approved structural drawings.

Pitched Roof & Drainage

The pitched roof uses profiled steel sheets. Roof build-up, insulation layer, internal lining, ridge capping, gutter and downpipe supply scope are confirmed per order and project specification.

On-Site Assembly

The steel frame is erected on the prepared foundations, followed by wall panel installation, roof sheeting and fit-out. The assembly sequence, required equipment and site access requirements are agreed before dispatch. Assembly documentation and any installation support are confirmed per order.

Materials & Configuration

ComponentSpecification
Steel frame & profilesSteel columns, beams, roof trusses and purlins with protective finish per approved specification; member sizes, connection details and surface treatment per approved structural drawings
Wall panelsColour-coated sandwich panels; core material (rock wool, glass wool or polyurethane), thickness and exterior finish per project specification
Roof sheets & insulationProfiled colour-coated steel roof sheets; roof build-up, insulation layer, internal lining, ridge capping, gutter and downpipe supply scope confirmed per order and project specification
Doors & windowsDoor and window types, sizes, positions and glazing confirmed per approved floor plan; security bars and hardware per project requirement
Floors & upper-floor build-upGround and upper-floor construction, supporting structure, floor finishes and supply responsibilities are confirmed in the approved project specification
MEP & fit-outElectrical distribution, lighting, plumbing and HVAC scope agreed per order; internal partitions and finishes confirmed in the approved drawings

Installation

01

Confirm Layout & Site Requirements

Floor plan, storey count, door and window positions, structural loads and site access requirements are confirmed before production. Foundation design, local engineering approvals and the responsible parties for each are agreed per project.

02

Prepare Foundations

Foundations are prepared to the approved design before the steel frame arrives on site. Foundation type — concrete pad footings, strip footings or ground beams — depends on ground conditions, building loads and local requirements.

03

Erect Frame & Install Enclosure

Steel columns, beams and roof trusses are erected and braced. Wall panels, roof sheets, doors and windows are then installed. The assembly sequence and required lifting equipment are agreed before dispatch.

04

Complete Fit-Out & Checks

Internal partitions, flooring, MEP and finishes are completed to the agreed scope. Required assembly documentation and any installation support are confirmed before dispatch. Packing, loading plans and shipping documentation are agreed per order.

Frequently Asked Questions

Enquire About Prefabricated Buildings

Share your project requirements and we will prepare a tailored quotation.

Or email us at yupengwu84@gmail.com