Category 09
Mobile Integrated Bathroom
Standalone mobile sanitary units for temporary or remote-site sanitation — self-contained, relocatable, and supplied ready to connect.
Product Gallery
Use Cases
Application Scenarios
Construction Site Sanitation
Temporary sanitary facilities for construction sites. Units can be positioned close to the work area and relocated as the project progresses. Mains or tank-based water supply options are available.
Remote & Off-Grid Sites
Sanitary facilities for remote mining, energy, and infrastructure projects where mains services are not available. Self-contained tank-based units can operate independently of mains water and drainage.
Events & Festivals
Temporary sanitary facilities for outdoor events and festivals. Units can be transported to site, connected to temporary services, and removed after the event.
Renovation & Temporary Facilities
Temporary sanitary facilities for buildings undergoing renovation where existing bathrooms are out of service. Units can be positioned outside the building and connected to temporary services.
Why Choose This Product
Why Choose Mobile Integrated Bathrooms
Self-Contained
Units are self-contained and can be operated with mains or tank-based water supply and drainage. This makes them suitable for remote and off-grid sites.
Relocatable
Units are designed to be transported and repositioned. This makes them suitable for projects where the sanitary facility needs to move as the work progresses.
Factory-Finished
Units arrive on site with all fixtures, fittings, and services installed. No on-site wet trades are required.
Configurable
Unit configuration, fixture count, and services connection type are agreed with the buyer. Both mains-connected and self-contained tank options are available.
Durable Construction
Units are built to withstand the conditions of a construction or industrial site — robust finishes, secure doors, and weather-resistant construction.
Export-Ready
Units are packed for sea freight and can be shipped to any port worldwide.
Configuration
Unit Configuration Options
Mains-Connected Unit
Unit connected to mains water supply and drainage. Suitable for sites with access to mains services. Connection points are agreed with the buyer.
Self-Contained Tank Unit
Unit with integral fresh water and waste water tanks. Suitable for remote and off-grid sites where mains services are not available.
Multi-Fixture Unit
Larger unit with multiple WC, shower, and washbasin fixtures for sites with a higher number of users. Layout and fixture count are agreed with the buyer.
Technical Data
Indicative Specifications
Dimensions and specifications are indicative only. All values are confirmed with the buyer before production.
Construction
Construction & Finish
Interior Finish
Interior wall and floor finishes are selected to the buyer's specification. Durable, easy-clean finishes are recommended for construction site and industrial applications.
Fixture Selection
WC, shower, and washbasin fixtures are selected to the buyer's specification. Vandal-resistant fixtures are available for high-traffic applications.
Packing for Export
Units are packed for sea freight export. Packing lists and installation instructions are supplied with each shipment.
Manufacturing
Factory Capability
Pengboxingchen operates a manufacturing facility in Wujiang District, Suzhou, Jiangsu, China. All products are fabricated in-house and packed for sea freight export. Quality checks are carried out at each production stage. Third-party inspection before dispatch can be arranged by the buyer.
All products are manufactured to agreed drawings and specifications. Quality checks are carried out at each production stage. Buyers may arrange third-party inspection before dispatch.
Logistics
Packing, Shipping & Installation
Units are packed for sea freight export in standard 20ft or 40ft containers.
Packing lists and installation instructions are supplied with each shipment.
Buyers are responsible for import clearance, local transport, and positioning on site.
Mains-connected units are connected to services by the buyer's team on site.
Self-contained tank units are operational once positioned and filled.
Pengboxingchen can provide technical support by video call during the installation process.
Common Questions
Frequently Asked Questions
Get in Touch
Request a Quote
Send us your project brief — floor area, quantity, site location, and timeline — and we will prepare a quotation. We supply buyers worldwide and can arrange sea freight to any port.
Contact Information
Group 5, Cao Village, Zhenze Town,
Wujiang District, Suzhou, Jiangsu, China
