Category 11

Gable-Roof Quick-Assembly House

A detachable modular cabin with a pitched roof, front balcony and guardrails. Configure the layout, finishes and openings for your project.

Gable-roof quick-assembly house with front balcony, grey guardrail and wood-grain panels

Applications

Planned Use Cases

The following represent typical planning scenarios for this product type. They are intended uses, not confirmed delivered projects.

Modular office application reference — multi-storey commercial building with glazed facade

Office

Single or multi-unit arrangement for site offices, administrative buildings, and commercial workspace.

Modular dormitory application reference — multi-unit residential building with walkway access

Dormitory

Multi-unit dormitory layout for workforce accommodation, student housing, and temporary residential use.

Modular shop application reference — illuminated commercial building with glazed ground floor

Shop

Retail and commercial shop front with configurable glazing and signage panel options.

Modular showroom application reference — container-style building with rooftop terrace

Showroom

Product showroom or exhibition space with open-plan interior and large glazed openings.

Modular cafe application reference — compact building with outdoor seating area

Cafe

Cafe and food-service use with front balcony seating area and wood-grain panel finish.

Modular reception application reference — container office building with professional facade

Reception

Site reception, security post, or visitor centre with professional facade and interior fit-out.

Core Advantages

Why Choose This Product

Steel Frame with Anti-Corrosion Finish

Q235 steel structural frame with a protective coating applied during fabrication. Suitable for outdoor installation in a range of climates.

Insulated Panel Options

Wall and roof panels with insulation core options. Panel specification is confirmed at order stage to suit the project climate and use.

Configurable Layout and Openings

Door and window positions, internal partition layout, and balcony configuration can be discussed and confirmed at drawing stage.

Detachable Assembly

The frame and panel system is designed for on-site assembly and, where required, disassembly and relocation. Frame connections and installation method follow approved drawings.

Front Balcony and Guardrail

Integrated front balcony with steel guardrail. Adds usable outdoor space and a distinctive facade element to the standard module.

Wood-Grain Panel Finish

Wood-grain colour-coated steel panels are available as a finish option. Other colours from the standard palette can also be specified.

Product Options

Configuration Packages

Two starting configurations are available. Both include the gable roof, front balcony, and steel guardrail. Final specification is confirmed in the formal quotation.

Standard gable-roof modular house configuration
Standard

Standard Configuration

  • Q235 steel frame with protective coating
  • Gable pitched roof with standard panel
  • Front balcony with steel guardrail
  • Standard sandwich-panel walls
  • Steel security door
  • uPVC or aluminium windows (position TBC)
  • Electrical wiring and fittings per agreed spec
Custom panel and finish package — light wood grain example
Custom

Custom Panel & Finish Package

  • All items in Standard Configuration
  • Wood-grain or custom colour-coated panel finish
  • Panel core specification per project climate
  • Custom door and window positions
  • Custom balcony width and guardrail style
  • Custom logo or signage panel (subject to design)
  • Custom interior partition layout

Structure & Specifications

Reference Specification

Values below are indicative for the base module. The gable roof and front balcony add to the overall height and footprint. Final dimensions, weights, and material grades are confirmed in the approved drawings and formal quotation.

ParameterReference Value
Base Module WidthConfirmed per order (typical range 3 m – 6 m)
Base Module LengthConfirmed per order (typical range 4 m – 12 m)
Wall HeightConfirmed per order (typical 2.5 m – 3.0 m)
Structural FrameQ235 steel with protective coating
Roof TypeGable pitched roof with corrugated steel sheet
Wall PanelsColour-coated steel sandwich panel; core per specification
FloorSteel floor frame; floor finish per specification
DoorsSteel security door; quantity and position per drawing
WindowsuPVC or aluminium frame; size and position per drawing
BalconyFront balcony with steel guardrail; width per specification
ElectricalWiring, sockets, and lighting per agreed electrical specification
Frame ConnectionsConnection and installation method follow approved drawings
Exploded isometric diagram showing modular frame components with English labels \u2014 general structural reference illustration

Reference illustration of modular frame components with English labels. This is a general structural reference diagram and does not represent the exact gable-roof assembly. Approved drawings are provided with the formal quotation.

Materials & Components

Key Components

Glass wool insulation rolls used in roof and wall panels

Glass Wool Insulation

Thermal and acoustic insulation layer within roof and wall sandwich panels.

Steel fixing channels for panel and frame connections

Fixing Channel

Galvanised steel channels used to secure wall and roof panels to the frame.

Q235 steel beams for structural frame

Steel Beams

Q235 structural steel beams forming the primary load-bearing frame.

Steel corner posts for modular frame assembly

Corner Posts

Vertical corner posts connecting floor, wall, and roof frame members.

Powder-coated steel corner fittings for frame joints

Corner Fittings

Bolted corner fittings providing rigid connections at frame junctions.

Colour-coated sandwich panels for walls and roof

Sandwich Panels

Colour-coated steel-faced sandwich panels with insulation core for walls and roof.

Steel security door for modular building

Steel Doors

Steel security door with frame, hardware, and weather seal included as standard.

uPVC framed windows for modular building

uPVC Windows

uPVC or aluminium-framed windows; size and position confirmed per approved drawing.

Colours & Finishes

Exterior Shell Colour Options

Six product colour options are shown below. Select a colour to note it in your enquiry. Custom colours can be discussed subject to minimum order requirements.

Full Colour Palette (12 options)

Colours shown are visual references only. Confirm the physical sample before placing an order. Custom colours are available subject to minimum order quantity.

Factory & Quality

Production & Inspection

Steel fabrication workshop with overhead cranes

Workshop

Panel and frame production line in factory

Production

Factory team group photo

Team

Office and project management team at work

Office

1

Frame Fabrication

Steel frame members are cut, drilled, and assembled in our Suzhou facility. Protective coating is applied after fabrication.

2

Panel Production

Sandwich panels are produced to the confirmed specification. Core material and facing colour are verified against the order before assembly.

3

Pre-Delivery Inspection

Each order is inspected before packing. Dimensions, coating, panel fit, and hardware are checked against the confirmed drawings.

4

Project Communication

We provide drawings for review before production. Questions about the specification are addressed during the drawing review stage.

Packing, Shipping & Installation

Logistics & On-Site Assembly

Components are packed with protective wrapping and bundled for container loading. Packing method is confirmed per order.
Container volume and gross weight are calculated per order based on the confirmed unit quantity and specification. We do not quote a fixed number of units per container.
Shipping is quoted FOB China. Freight, destination port charges, and import clearance are the buyer's responsibility.
On-site foundation design is the buyer's responsibility and should be prepared to the specification provided with the drawings.
An installation guide and reference video are provided with each order. Self-assembly is the standard arrangement.
Overseas on-site technical supervision is available as an optional service at additional cost, subject to visa and travel conditions.
Production lead time and shipping schedule are confirmed in the formal quotation after order confirmation.
Loading and dispatch \u2014 workers unloading materials from delivery truck

Customisation & Support

Custom Options & After-Sales

Size & Layout

Module width, length, and internal partition layout can be customised. Share your site plan and brief for a layout proposal.

Panel Finish & Colour

Wood-grain, solid colour, and custom colour-coated panels are available. Colour confirmation is required before production.

Openings & Hardware

Door and window positions, sizes, and hardware can be specified. Custom glazing configurations are available subject to structural review.

Electrical & MEP

Electrical specification including socket layout, lighting, and distribution board is confirmed at drawing stage. MEP options are available on request.

After-Sales Support

Installation guide and reference video are provided with each order. Technical questions during installation are supported by our project team.

Customisation reference board showing colour palette, architectural photography and interior design options

FAQ

Frequently Asked Questions

Ready to Discuss Your Project?

Share your size, quantity, and requirements. We will prepare a formal quotation for your review.