Category 12

Fire-Resistant Mobile Partitions

Framed partition panels with fixed-base and mobile configurations shown. Confirm panel construction, dimensions, base arrangement and the required fire-performance documentation for your application.

Configuration Details

Panel & Frame Construction

Each panel consists of a framed face sheet assembly. The frame profile, face sheet material, core construction and overall panel thickness are confirmed per the approved specification for the intended application. Panel markings and supplied signage are agreed with the order specification.

Fixed-Base Configuration

The workshop photograph shows framed panels with support feet. Foot design, attachment and any floor-fixing arrangement are confirmed per approved specification.

Mobile Configuration

The mobile photograph shows panels with red support frames and castors. Castor type, load capacity, braking or locking provisions and handling method are confirmed for the selected configuration.

Planning & Specification

Fire performance must be confirmed against the test documentation for the specified complete assembly and intended installation.

ItemSpecification
Panel dimensions (H × W)Confirmed per approved specification; dimensions visible in photographs are configuration references only
Frame profile & finishFrame section, surface treatment and colour confirmed per approved specification
Panel core & face sheetsCore material, face sheet type and overall panel thickness confirmed per approved specification
Fire performanceFire performance must be confirmed against the test documentation for the specified complete assembly and intended installation. No fire rating is stated here.
Base / support arrangementFixed-base feet or mobile support frame with castors; foot design, castor type, load capacity and braking or locking provisions confirmed per approved specification
Panel quantity per orderConfirmed per order; minimum order quantity and packaging arrangement agreed before production

Handling & Placement

01

Confirm Specification & Documentation

Before ordering, confirm the required panel dimensions, base configuration, panel construction and any fire-performance documentation required for your application and jurisdiction. These panels are configuration references; suitability for a specific installation must be assessed by the buyer.

02

Agree Quantity & Packaging

Panel quantity, packaging arrangement and loading plan are agreed before production. Provide the destination port or delivery address, required quantity and any site access constraints when requesting a quotation.

03

Receive & Inspect on Arrival

Inspect panels on arrival against the packing list. Check frames and face sheets for transit damage before removing protective wrapping. Report any discrepancies before installation.

04

Position & Secure

Follow the approved placement and handling instructions, including the specified restraint, anchoring and wheel-locking provisions where fitted.

Frequently Asked Questions

Enquire About Fire-Resistant Mobile Partitions

Share your screen size, quantity, location and required performance documentation and we will prepare a tailored quotation.

Or email us at yupengwu84@gmail.com