Category 08

Apple Cabin — Rounded Modular Spaces for Work & Leisure

A distinctive rounded exterior, generous glazing and project-specific layouts. Explore our cabin configurations for reception, commercial spaces, offices and leisure projects.

Long single-storey white Apple Cabin with black-framed blue glazing, exterior view

Applications

Each configuration is designed to an agreed layout; fit-out and services are confirmed in the project specification.

Office & Reception

The rounded white shell and full-height glazing suit corporate reception points, site offices and management facilities. Layout, partitioning and fit-out are agreed at the design stage to meet your operational requirements.

Retail & Service Kiosk

Compact single-unit configurations with service counters and coloured trim are used for ticketing, retail and hospitality kiosks. Internal services and counter arrangements are confirmed in the approved layout drawings.

Leisure & Hospitality

Multi-unit or stacked arrangements with external staircases and balconies can be designed for leisure and hospitality settings. Two-storey configurations are subject to structural engineering approval and site-specific design.

Public Amenities

The Apple Cabin shell can be configured as a public amenity block with tiled interiors, plumbing and accessible fittings. Fit-out scope, fixture specification and service connections are defined in the project agreement.

Core Advantages

Rounded Profile

Smooth radiused corners and a clean white exterior give the Apple Cabin a distinctive appearance that stands out in commercial and leisure settings.

Glazed Facades

Generous window openings maximise natural light and visual connection to the surroundings. Frame materials, glazing and opening types are specified for each project.

Flexible Layout Planning

Internal partitioning, door positions and service routes are designed to your approved plan, accommodating a wide range of uses within the same shell form.

Choice of Finishes

Exterior panels are available in white, contrasting trim colours, terracotta tones and wood-look finishes. Confirm colours and finishes against agreed samples before production.

Factory Fabrication

Shell, frame, cladding and glazing are assembled under controlled factory conditions before dispatch, reducing on-site work and supporting quality consistency.

Project-specific Delivery

Transport method, lifting plan and foundation interface are assessed for each project based on final dimensions, weight and destination access conditions.

Structure & Materials

Shell & Frame

The Apple Cabin is built on a steel structural frame with rounded corner profiles. Exterior cladding panels are fixed to the frame and finished in the selected colour or texture. The photograph shows the interior at pre-fit-out stage; finished linings, insulation and services are installed to the agreed specification.

Facade & Openings

Window and door openings are positioned to the approved layout. Frame materials, glazing and opening types are specified for each project.

Internal Lining & Insulation

Internal lining, insulation type and thickness, and fire, acoustic and thermal performance are confirmed in the project specification and are not inferred from the pre-fit-out photograph.

Electrical & Plumbing Coordination

Conduit, cable routes and plumbing rough-in are coordinated with the approved layout during fabrication. Final connections to site services are made by locally licensed contractors on installation.

Rounded Edges

Corner radii are formed in the cladding panels and frame, giving the Apple Cabin its distinctive smooth profile.

Panel Junctions

Panel joints are sealed and finished to minimise water ingress. Joint detail and sealant specification are confirmed per project.

Window Layout

Window positions, sizes and opening configurations are set in the approved drawings. Glazing bars and frame sections are visible in the exterior photograph.

Specifications

Drawings and quotation define the supplied configuration. All values below are project-specific and confirmed at the design stage.

Product familyApple Cabin
External dimensionsProject-specific
LayoutTo approved plan
Exterior finishWhite / contrasting trim / colour / wood-look as selected
GlazingFrame, glass and opening specs per project
Internal finish and servicesPer agreed scope
Foundation / supportsSite-specific design
Delivery methodBased on final dimensions, weight and route

Colours & Finishes

Screen colours are for reference only. Confirm colours and finishes against agreed samples before production. The orange image shows an assembly-stage shell.

Selected finish: White & Dark FramesEnquire with this finish

Manufacturing & Fit-Out

Each Apple Cabin is fabricated in our Suzhou factory before dispatch. The scope of finished interior — including bathroom fit-out, floor finishes and MEP installations — depends on the agreed order specification.

01

Agree Drawings

Layout, dimensions, openings, finishes and services are confirmed in approved drawings before production begins.

02

Shell & Frame

Steel frame and rounded cladding panels are fabricated and assembled under factory conditions.

03

Openings & Services

Glazing, doors, electrical conduit and plumbing rough-in are installed to the agreed specification.

04

Inspection & Packing Plan

Completed units are inspected against drawings and a transport and packing plan is prepared for dispatch.

Learn more about our manufacturing process →

Delivery & Installation Planning

Transport, lifting and installation are planned for each project based on the actual cabin dimensions and destination conditions.

01

Confirm Transport Envelope

Final dimensions and weight are assessed against transport route constraints and local regulations.

02

Prepare Foundations & Access

Client prepares foundations and site access to the agreed specification before delivery.

03

Lifting & Positioning Plan

Appropriate lifting equipment and a positioning sequence are coordinated for the site conditions.

04

Connect & Inspect Services

Local licensed contractors connect electrical, plumbing and other services; final inspection confirms readiness.

Project Inspiration

Explore cabin configurations for your next project.

Single-storey office configuration example.
Custom two-storey arrangement — subject to structural design and site approval.
Browse all projects →

Frequently Asked Questions

Can the cabin be made to a custom size or layout?+
Yes. External dimensions and internal layout are project-specific. We work from your brief to produce approved drawings before fabrication begins.
What standard fittings are included?+
Standard scope covers the shell, frame, cladding, glazing and basic electrical conduit. Additional fittings — flooring, ceilings, furniture, MEP — are agreed per project.
Is a bathroom possible?+
Yes. Wet-room and bathroom configurations are available. Plumbing rough-in, tiling and fixtures are specified and priced as part of the project scope.
Can a two-storey arrangement be supplied?+
Multi-storey stacking is possible subject to structural engineering approval, local building regulations and site-specific design. Please share your project requirements for assessment.
How is the cabin shipped?+
Transport method — flat-rack, open-top or standard container — is assessed for the actual cabin dimensions, weight and destination port. We advise on the most practical option at the quotation stage.
What information do you need for a quotation?+
Intended use, approximate floor area or unit count, preferred finish, destination country and port, and any known site or access constraints. Sketch layouts or reference images are welcome.

Enquire About the Apple Cabin

Share your project requirements and we will prepare a tailored quotation.

Selected finish: White & Dark Frames